S/Y Maltese Falcon – Complex refit and technical interventions
01. Scope of Works
Removal of existing propulsion system and installation of new high-efficiency marine engines with upgraded shaft configuration.
02. Project Overview
This 48-meter yacht required a complete propulsion system replacement to improve fuel efficiency and operational reliability. The project involved precision lifting operations, controlled removal of legacy equipment and structural adjustments to accommodate the new engine configuration. All alignment procedures were performed under strict engineering supervision, ensuring optimal shaft geometry and vibration control standards.